Final Basic Assessment for the Proposed Relocation Of a 132 Kv Powerline at Vandyksdrift Central (VDDC) Section of the Wolvekrans Colliery


NOTICE OF A BASIC ASSESSMENT FOR THE PROPOSED RELOCATION OF A 132 KV POWERLINE AT VANDYKSDRIFT CENTRAL (VDDC) SECTION OF THE WOLVEKRANS COLLIERY, BY SOUTH32 SA COAL HOLDINGS (PTY) LIMITED IN EMALAHLENI LOCAL MUNICIPALITY, MPUMALANGA

Final Basic Assessment Report available for review

Project:           Application for Environmental Authorisation for the proposed relocation of a 132kV powerline at Vandyksdrift Central (VDDC)

Client:             South32 SA Coal Holdings (Pty) Limited

A Basic Assessment process will be conducted for the relocation of a 132 kV powerline between the Eskom Kromfontein Substation and the Eskom Klein Substation at Vandyksdrift Central (VDDC) section which is part of the Wolvekrans Colliery. The powerline realignment project will take place on Portions 3, 5 and 7 of the farm Vandyksdrift 19 IS. The application is undertaken by South32 SA Coal Holdings (Pty) Limited in terms of a self-build agreement with Eskom Holdings SOC Limited. The Environmental Authorisation (EA) will be transferred to Eskom on completion of the construction phase. The relocation of the powerline is necessary for the approved opencast mining to commence.

The Revised Draft Basic Assessment Report was available for review from 16 March to 16 July 2020. The report was finalised and no significant changes were made. The Final Basic Assessment Report has been submitted to the competent authority, the Mpumalanga Department of Agriculture, Rural Development, Land and Environmental Affairs (MDARDLEA) on 24 July 2020 for their review and decision-making. A copy of the report can be downloaded below.

COMMENTS ON THE FINAL BASIC ASSESSMENT REPORT

Interested and Affected Parties are requested to submit any further comments on the Final Basic Assessment Report to the DMR and to copy the public participation office – see contact details below.

Mpumalanga Department of Agriculture, Rural Development, Land and Environmental Affairs (MDARDLEA)

Case officer: Ms Charity Mthimunye

Email: cnmthimunye@mpg.gov.za

Phone: (013) 692 6300

Use reference number: 1/3/1/16/1N-228

 

Jones & Wagener Engineering and Environmental Consultants

Anelle Lötter / Tolmay Hopkins

Email: anelle@jaws.co.za  / tolmay@jaws.co.za

Tel: (011) 519 0200

WAY FORWARD

The way forward will include the following steps:

  • MDARDLEA and the commenting authorities will review the Final Basic Assessment Report.
  • Based on their findings, MDARDLEA will grant or refuse authorisation – a decision stating that the project may go ahead as planned or a decision stating that the project may not continue. For either of the decisions, the department will provide reasons.
  • Stakeholders will be notified of the decision in writing, within 14 days of the date of the decision on the application.
  • J&W will send this notification to you as well as the details of the appeal process. Any party may appeal the decision that was taken by MDARDLEA. Please note that there are specific appeals procedures to be followed.

Part 1: Final Basic Assessment Report

Icon

RE-ALIGNMENT OF 132kV KROMFONTEIN POWERLINE FINAL BASIC ASSESSMENT REPORT PART 1 13.34 MB 7 downloads

H759 - Final Basic Assessment Report ...

Appendix A  – EAP Details

Icon

Appendix A - EAP Details 511.16 KB 6 downloads

H759 - Final Basic Assessment Report ...

Appendix D  – Public Participation

Icon

Appendix D3 - Advertisement 997.66 KB 4 downloads

H759 - Final Basic Assessment Report ...

Icon

Appendix - D5 - Notification - FBAR 2.29 MB 4 downloads

H759- Final Basic Assessment Report Part 1 - Appendix D5 ...

Icon

Appendix D6 - Proof of Delivery 17.09 MB 6 downloads

H759 - Final Basic Assessment Report ...

Icon

Appendix - D7 - Meetings with DWS 4.95 MB 3 downloads

H759 - Final Basic Assessment Report ...

Appendix F  – Specialist Studies

Icon

Appendix F1 - Visual 4.39 MB 3 downloads

H759 - Final Basic Assessment Report ...

Icon

Appendix F2 - Soils, Land Use and Land Capability Assessment 4.76 MB 3 downloads

H759 - Final Basic Assessment Report ...

Icon

Appendix F3 - Wetland and Biodiversity Assessment 4.69 MB 4 downloads

H759 - Final Basic Assessment Report ...

Icon

Appendix F4 - Surface Water Assessment 8.06 MB 4 downloads

H759 - Final Basic Assessment Report ...

Icon

Appendix F5 - Heritage Assessment 1.39 MB 3 downloads

H759 - Final Basic Assessment Report ...

Icon

Appendix F6 - Palaeontological Assessment 2.80 MB 3 downloads

H759 - Final Basic Assessment Report ...

Part 2:  Environmental Management Programme

Icon

RE-ALIGNMENT OF 132KV KROMFONTEIN POWERLINE ENVIRONMENTAL MANAGEMENT PROGRAMME - PART 2 1.82 MB 6 downloads

H759-  Re-Alignment of 132kv Kromfontein Powerline Environmental Management Programme...